大香国产视频中文字幕,日韩精品中文字幕av在线,美女涉黄视频在线观看免费,四虎最新地域网名免费苹果,欧美一区二区三区四公司,亚洲乱码一区在线观看,人妻少妇中文字幕av,操逼啊啊啊啊啊啊嗯嗯嗯欧美下载,人人妻人人爱蜜臀av

The specific operation steps of the multi-tube vortex mixer?

1. The instrument should be placed in a smooth place, preferably on a glass table. Press the instrument gently to make the rubber feet at the bottom of the instrument attract the table.

2. Before using the instrument, set the speed control knob to the minimum position and turn off the power switch.

3. If the motor does not rotate after turning on the power switch, check whether the plug is in good contact and whether the fuse is blown (the power should be cut off).

4. In order to make the multi-tube vortex mixer work well in balance and avoid large vibration, all test bottles should be evenly distributed when bottling, and the solution of each bottle should be approximately equal.

5. Turn on the power, turn on the power switch, the indicator light is on, slowly adjust the speed control knob to increase to the required speed.

6. The instrument should be kept properly. It should be placed in a dry, ventilated, and non-corrosive gas place. Do not allow liquid to flow into the movement during use to avoid damage to the components.

Service Hotline

+86 0574-28828003

+86 0574-89085812

+86 0574-89085813

+86 0574-89085815

Technical consulting

Ask for price

Provide color pages

Manual

whatsapp